Category: Completed Projects

New Circle Reading Room in Daley Library

The Circle Reading Room opened in the northeast corner of the first floor Feb. 22, the 50th anniversary of what was originally called the Circle Campus. The room’s opening was part of the day-long “Circle Back-UIC Forward” anniversary celebration.


Renovated Lecture Center F

Renovated Lecture Center F includes progressive, state-of-the-art A/V multimedia podiums, new seating, increased surface workspace, adjustable lighting, and sheer drapes to maximize natural light. The design reflects an emphasis on respecting and highlighting the existing architecture of the building.